The empty boxes really started to pile up.
Sixty-four down, sixty-four to go!
Vince is installing the sliders onto a stack of machines.
The final stack of machines are ready to be installed. Note the huge bags
of styrofoam left from when the boxes were broken down.
All of the systems are physically in place, but we still have to run power,
networking, etc. We also still need to order some blank panels for the
middle of the racks.
Vince, Trey, and Roger discuss how best to proceed.